Demolition on Key Biscayne for condo unit interiors, older single family homes making way for new elevated construction, and pools and patios on island lots.
Inside the oceanfront towers, interior demolition removes floors, kitchens, and baths down to the concrete shell, with protected elevators and quiet hours set by the association. In the village, older concrete block homes are often taken down so new homes can be built higher to meet current flood standards. We plan the demolition sequence so debris stays on the lot, dust is controlled in the wind, and neighbors are protected. Work runs from the approved permit and the building's rules.
We cover Key Biscayne and all of Miami-Dade County, 24 hours a day. Call or text (305) 615-9169 or send the form with photos.
The only way on or off the island is the Rickenbacker Causeway, so every truck, machine, and load of material crosses it, and morning, evening, and weekend beach traffic all affect timing. Condo associations set firm rules for loading docks, elevators, contractor hours, and insurance wording before anyone starts. Digging can reach water quickly in sandy ground, and salt exposure is a factor in material choices and equipment care.
The demolition work we do most in Key Biscayne.
Demolition across Broward and Palm Beach County. See the main page.
Answers to the questions we hear most. Do not see yours? Call (305) 615-9169 or send it with the form below.
Send the address and what you need. Photos help us quote faster.
24 hours a day, 7 days a week.
Barraza Industries LLC
Miami-Dade · Broward · Palm Beach
Call or send the form. We answer 24/7 and give you a clear written quote.